Objectives

The objective of this project is to prepare data for digital delineation of watersheds for the water quality segments in the Trinity Basin. To get the watersheds the following steps have to be completed:

 Data have to be downloaded and projected

 Point layers have to be associated with a "clean" river network.

 The river network has to be burned in the DEM's

 Then the digital delineation can be done!

 

Currently no watershed delineation has been done, this term project includes anyhow important steps in the direction of completing the preparation for the delineation. Data layers were downloaded, projected and a river network is being built.

 

 

 

Back to Main Page

Introduction

Data

Procedure

Conclusions

References